1、 |
You should be a legal incorporate company or individual business unit. |
|
|
2、 |
You should have stable operation place, sales networks, and sales persons. You’d better have experience in representing similar products. |
|
|
3、 |
You should have good credit, social resources, and financial status. |
|
|
4、 |
You should have operation background in heat energy industry. |
|
|
5、 |
You should fill in the agent form in details and get accreditation from our sales director。 |
| |
|
|
|
|
|
|
| Products |
ELECTRIC STEAM BOILERS>> |
STANDARD FEATURES AND EQUIPMENT |
| ☆ |
National boiler pressure vessel supervise regulations |
| ☆ |
Steam boiler safety technology supervise regulations |
| ☆ |
According to UL834 (American |
| ☆ |
Insurance Association) standard |
| ☆ |
Heavy duty steel boiler vessel housing |
| ☆ |
75mm fiberglass insulation |
| ☆ |
1100KW,each boiler installs two |
| ☆ |
Steel pressure gauge |
| ☆ |
Feedback stop and check valves |
| ☆ |
Float-type low water cutoff |
| ☆ |
Probe-type low water cutoff |
| ☆ |
Standard water gauge |
| ☆ |
Incoloy sheathed elements |
| ☆ |
Two adjustable high limit cutouts |
| ☆ |
Up drain valve |
|
| ☆ |
Internal branch circuit fusing |
| ☆ |
High performance magnetic contactors |
| ☆ |
Main supply circuit lugs |
| ☆ |
120 volt fused control transformer |
| ☆ |
Power switch and pilot light |
| ☆ |
Status pilot light for each step |
| ☆ |
Preheat switch (above 240KW) with pilot light |
| ☆ |
Drain valve (volume>500L, each boiler installs two) |
| ☆ |
According to National and ASME safety relief valve(s) |
| ☆ |
Pressure control via: staged on/off pressure switches units of 1between 4
proportional progressive sequence step control 4stages |
|
|
|
Schematic drawing
|
|
|
|
*
If you do not have  Please click on the download |
|
|
|
|